Time for some more pool pics! This past week there was quite a bit done, although it doesn't look too impressive from the photos. The plumbers came, ran all the pipes and set up the pool equipment on the side of the house. They also put up all the tile and some of the coping.


The pavers were all dropped off this week, it took two trucks to bring them all. The dirt's been smoothed out and they should be ready to put the pavers in first thing next week.